 
                                                                    
                                                                Vínculo 2019119 de E330 Excavator Forging Track Chain
| Datos del producto: | |
| Lugar de origen: | China (continente) | 
|---|---|
| Nombre de la marca: | YT | 
| Número de modelo: | U30 a 6 | 
| Pago y Envío Términos: | |
| Cantidad de orden mínima: | 1 PCS | 
| Precio: | negotiable | 
| Detalles de empaquetado: | Envasado de exportación | 
| Tiempo de entrega: | 7-30 días | 
| Condiciones de pago: | L/C, T/T | 
| Capacidad de la fuente: | 10000 pcs/mes | 
| Información detallada | |||
| Material: | acero 40Mn2 o 35MnBH | Técnica: | Forja | 
|---|---|---|---|
| Calidad: | Tratamiento térmico HRC 40-55 | Profundidad HRC: | 4 a 10 mm | 
| Color: | Negro o cliente requerido | Tiempo de garantía: | 12 a 18 meses | 
| Finalizar: | Liso | Condiciones de pago: | Negociable | 
| Resaltar: | Heavy Duty Track Chain Link,OEM Replacement Excavator Track Chain,Self-Lubricated System Undercarriage Track Chain | ||
Descripción de producto
Our facility employs sophisticated horizontal and vertical CNC systems for operations like cutting, boring, tapping, and milling, all aimed at enhancing the precision and reliability of each part. This meticulous approach ensures the alignment and fit of assembled components are spot-on, thereby extending the operational lifespan of the parts and reducing the cost per unit produced.
Track link is made of 35 MNB forged special steel that is reinforced with structure technology and advanced heat treatment process, which ensures maximum strength and abrasion resistance to the product. The self-lubricated system enhances the service life of track chain bearing remarkably.
 
 
| Suitable Model | P | A | B | C | E | F | H | K | L | 
|---|---|---|---|---|---|---|---|---|---|
| U30-6/EX30/EX35/PC30 | 101.6 | 55 | 55 | 22 | 10.5 | 35 | 76 | 63 | 26 | 
| SK025/SK30/SK32 | 101.6 | 65 | 65 | 22 | 10.5 | 45 | 86 | 63 | 26 | 
| PC20 | 101.6 | 52 | 52 | 22 | 10.5 | 32 | 73 | 65 | 28 | 
| PC60-3/5/DBC8060 | 135 | 99 | 72 | 43.2 | 12.5 | 45 | 105 | 75 | 35 | 
| EX40/EX45 | 135 | 104 | 80 | 46 | 12.5 | 52 | 105 | 65 | 30 | 
| PC100-2/PC100-3/HD350 | 154 | 112.4 | 82.4 | 57 | 14.5 | 49.4 | 124.4 | 87 | 40 | 
| R200 | 171.45 | 144.5 | 125.4 | 58.7 | 16.5 | 87.7 | 171.7 | 101.6 | 42.8 | 
| EX100/R900/E120 | 171.45 | 108 | 108 | 60.3 | 16.5 | 68 | 144.8 | 95 | 44 | 
| PC120/130-6/PC150 | 175 | 102.4 | 86.4 | 57 | 16.5 | 48.4 | 124.4 | 90 | 42 | 
| PC400-5/EX400-5 | 216 | 184 | 146 | 76.2 | 24.5 | 104 | 211.2 | 129 | 59 | 
| EX300-6/EX330-5/PC300 | 216 | 178.4 | 140.4 | 76.2 | 22.5 | 99 | 198.2 | 116 | 52 | 
The models above are just for reference. We can supply more products as per your requirements. Please feel free to send us your inquiry or email if you have any requirements.
 
 
We are an industry and trade integration business, our factory located in Quanzhou, and our sales department is in the center of Xiamen city.
Sample is free, but the customer needs to pay for shipping.
We usually accept T/T or L/C. Other terms also could be negotiated.
It depends on what you are buying. Normally, our minimum order is USD5000. One 20' full container and LCL container (less than a container load) can be acceptable.
FOB Xiamen or any Chinese port: 35-45 days. If there are any parts in stock, our delivery time is only 7-10 days.
We have a perfect QC system for the perfect products. A team who will detect the product quality and specification piece carefully, monitoring every production process until packing is complete, to ensure product safety into the container.
Incorpore su mensaje